Peel House Progress – December 19, 2020

More cement was poured this week in the elevator shaft. It is under those blankets. Due to the cold, it had to be kept warm!
Cinder blocks have been delivered for the elevator shaft!
They finished pulling up the bricks. These will be reused after construction is done!
In the basement, they’ve been working hard to scrape the damaged plaster and paint off the bricks. Look how pretty that exposed brick is!
More exposed brick!
This is the before! What a difference.
This special protected piping has been put in the basement for the hvac.