Peel House Progress – May 15, 2021

The tile floors in the kitchen are DONE!
Here is another view of the safe area in the kitchen. Notice the doors are put back on?
The newly added bathroom on the first level behind the kitchen is tiled as well!
The existing bathroom on the main level is half way through it’s makeover!
The glue on the stair way is being removed.
Another view of the steps.
Water fountains in the second floor are almost done!