Much of the work this week was done outside, weather permitting! The elevator shaft is almost done!A crane was brought in for the steel staircase.Inside, this massive support beam was brought in to hold the ceiling/upper floor up. It weights over 800 pounds!And this is where it will go in the kitchen.