Peel House Progress – January 30, 2021

Much of the work this week was done outside, weather permitting! The elevator shaft is almost done!
A crane was brought in for the steel staircase.
Inside, this massive support beam was brought in to hold the ceiling/upper floor up.
It weights over 800 pounds!
And this is where it will go in the kitchen.